Resource manager

Some items may require login to view or download

Search resources

Kingston Power Station Encapsulation

Case Study: Kingston Power Station Encapsulation

Sector: Residential/Commercial

Client: United House Ltd

Budget: In excess of £3,000,000

 

Brief:

Kingston Heights Barge Dock Development

Case Study: Barge Dock Development

Sector: Commercial/Restaurant/Coffee Shop

Client: United House Ltd

 

Brief:

To provide a platform over an existing barge dock to support the construction of a new restaurant and accommodation within the Kingston Heights residential and hotel development.

Key Details:

Charcon Construction Solutions supplies new adventure centre in Derbyshire

Precast concrete products manufacturer, Charcon Construction Solutions, part of the Aggregate Industries group, has successfully supplied and installed structural precast concrete materials for the new, state-of-the-art Mount Cook Adventure Centre in Derbyshire.

Jablite Thermal Floor System

Document type:
File size: 1.46mb
File format: pdf

Charcon Construction Solutions play a winning part in the 2015 Formula E races at London’s Battersea Park.

As a leading supplier of precast concrete to the UK construction industry, Charcon CS was called on by the organisers for the London 2015 FIA Formula E organisers to manufacture and deliver 7525 linear metres of safety barriers for the event.

Charcon Flooring goes live with Fast Track Service

Charcon Flooring has just completed investing in stock and back office infrastructures to offer a Fast Track T beam and Hollow Core slab offering.
The groups T beam range is now available on next day collect and a 2 day delivered service from receipt of beam schedule*

Charcon CS to supply barriers for the 2015 London Formula E race

Charcon Construction Solutions are delighted to have joined the race to manufacture and deliver over 7000 linear meters of concrete safety barriers for the Formula E race, which will take place on June 27th 2015 in Battersea Park, London.

Ground Solutions - NHBC 'Building For Tomorrow' Roadshow 2015

Ground Solutions Team will be exhibiting at the NHBC 'Building For Tomorrow' Roadshow 2015 at the Thistle Haydock Hotel, Thursday 5th of March.

 

Charcon beam and block Load span tables 12-2-15

Document type:
File size: 0.06mb
File format: pdf

Hollow Core Span Load Table

Document type:
File size: 0.04mb
File format: pdf